Note: Except for electrical work, Camp Akeela will cover all labor costs, thanks to Eric & Debbie, Camp Akeela directors! The costs below are for materials. Total needed to finish these renovations is only $6,745!
**********************************************************************
Replace metal roof, materials only $6,181.63
Current roof has hole (temp. patch) and is "very rough."
** Thanks to your donations, this work was completed before winter 2021-22 set in! YAY, TEAM! See COMPLETED page for pictures. **
New breaker box, wiring, switches, etc. $3,500
3 ceiling fans with lights @ $250 each 750
7 wall sconces @ $75 each 525
3 porch lights @ $100 each 300
Vermont sales tax, 6% 210
plus labor for electrician & assistant 3,395
Note: We have enough money in the bank to complete all the electrical work, with a little left over!
Furniture to include
2 couches (indoors)
2 comfy chairs (indoors)
4 porch chairs (all-weather)
a few tables
6 new crank-out windows w/screens
2- 4’x4’ $350 each
2- 33”x4’ $325 each
2- 33”x34” $325 each
Note: May switch to casement windows, which would add a little to the total. Whichever we use, we only need single pane windows, which are difficult to find in Vermont!
Total materials to refinish floor & some wall space
Drum sander rental $150
10 gallons polyurethane $400
4 x 5-inch wall brushes $45
Entry door 38”x80” full light $600
Screen door $350
18- 4” round railing pieces & posts @ $400
Steps: 2 sets, 24’ and 96’ (most replace) $700
5 gallons stain $200
Two approx. 6-foot trees for rear (east side) of Library -- either deciduous or evergreen; to be decided in consultation with Camp Akeela. Professionally planted, likely in August or September 2023.
A small perennial garden to be planted in the ground at the front (lake-facing) or south side (chimney side) of the Library. Marked off by rocks.
[Not yet costed. For inside the Library. To include names but not amounts.]